TSR2000-Series-Hardware-User-Guide
2.5 Course of the File Processing
To complete a process file there needs to be three steps: program-adjust-process . For detailed operation refer to the “operation manual of the teaching pendant”.
The method of teaching a program.
Program:
Adjusting the programming file, such as origin calibration, slant array, height adjusts, file parameters adjust (including speed, acceleration, delay time, distance etc.)
Adjust:
Download the program file to the system, from the teaching pendant.
Process:
The program is now complete and can be initiated.
3. SETUPAND CONNECTION
3.1 Setup
Power socket
Power switch
Power socket
DB9 – connect with 7-pin socket
DB37 - Additional Outputs
INPUT 1 5-pin socket. Connect to safety cover, photoelectric switch or low fluid switch.
OUPUT 7-pin socket. Connect with controller (DB9)
INPUT 2 4-pin socket. Connect to keybox
Air inlet
Connecting air tubing : directly insert the air tube into the air connector, on the back of the controller. Removing air tube : press down the connector head and then pull out the air tube, from the controller.
9
Made with FlippingBook - Online catalogs