5.3 Commissioning

Component commissioning is performed once positioning and connection operations are completed. Before performing component commissioning, the following checks must be performed:

• Verify that connections have been made correctly; • Verify that the component is free of dirt or residues of various types; • Verify that the holding knobs are secure in position; • Verify that the vent valve is closed;

ATTENTION! If even just one of the points listed above is not compliant, commissioning must not proceed. Commissioning must only proceed when all points have been completed successfully.

6 SOFTWARE

N.A.