900-32-USERGUIDE

First Steps

Step 1:

Unpack the shipping box and use the supplied checklist to make sure all items are present. If any items are missing, please contact us immediately.

Step 2:

Ensure the area where you are setting up the equipment has access to compressed air. Air pressure should be between 0 and 100 psi (0 and 6.9 bar). We provide a high pressure 5 micron filter/ regulator to ensure that the air supply is clean and dry. If your material requires a higher level of filter, please contact us or source from a specialist pneumatics supply company. Our filter/ regulator is part TSD800-6FR. A regulated and constant air pressure must be supplied to our syringe filling station.

Step 3:

Activate your one (1) year no fault warranty by filling in and returning the postage paid warranty card.

Setup

Assemble Stand:

Unpack the shipping box and use the supplied checklist to make sure all items are present. If any items are missing, please contact us immediately.

Place the stand on a flat surface/ work bench.

Thread the pole (1) into the base (2) by using the supplied nut. Turn clockwise and tighten.

Slide the rod clamp (3) onto the pole (1) to your suitable height and tighten the locking nut (4).

Attach cartridge mounting bracket with rod (16) to the rod clamp (3) and tighten. Position the arm to hold the reservoir horizontally as pictured.

Review the setup and adjust to the suitable height for your application.

The base stand and upright rod part number is 918-033-000 and is built specifically to handle the weight of a filled cartridge. Please ensure all screws are tight before inserting the filled cartridge.

5

Made with FlippingBook - Online magazine maker